Fee Schedule
New Accounts
$1400 minimum for line side
$1800 minimum for road bore
$1900 minimum for state highway bore
Water Line Extension
The “District” will contribute the lesser of $3200.00 or 66% of the cost per meter towards the project, not including tap fee.
(Tap fee is currently $1000; 9/20/2021)
New Sewer Line
Phase 1 – 4
$750 for line side
$850 for county or small road bore
$850 for highway bore plus $55 plus additional footage
Phase 5
$1050 for line side
$1150 for county or small road bore
$1150 for highway bore plus $55 plus additional footage
Woodland Hills
$550 Lot tap
Disconnects & Returned Checks
$500 reconnect charge should you decide to have the meter reinstalled.
$100 reconnect charge if a meter is locked due to no payment.
$25 charge applied if your payment is rejected due to insufficient funds.
Transfer Services
$30 transfer fee is added to the first bill to transfer water.
$20 fee is added to the first bill if the service is transferred to a renter from owner or from existing renter to new renter.
$10 transfer fee is added to the first bill to transfer sewer.
Moving
$25 charge occurs if final meter reading can not be produced by owner before moving.