top of page

Fee Schedule 

New Accounts

$1400 minimum for line side 
$1800 minimum for road bore

$1900 minimum for state highway bore
 

Water Line Extension

The “District” will contribute the lesser of $3200.00 or 66% of the cost per meter towards the project, not including tap fee. 

(Tap fee is currently $1000; 9/20/2021)

New Sewer Line

Phase 1 – 4
$750 for line side
$850 for county or small road bore
$850 for highway bore plus $55 plus additional footage

Phase 5
$1050 for line side
$1150 for county or small road bore
$1150 for highway bore plus $55 plus additional footage

 

Woodland Hills
$550 Lot tap

 

Disconnects & Returned Checks

$500 reconnect charge should you decide to have the meter reinstalled.

$100 reconnect charge if a meter is locked due to no payment. 

$25 charge applied if your payment is rejected due to insufficient funds.

Transfer Services 

$30 transfer fee is added to the first bill to transfer water.

$20 fee is added to the first bill if the service is transferred to a renter from owner or from existing renter to new renter.

$10 transfer fee is added to the first bill to transfer sewer.

Moving

$25 charge occurs if final meter reading can not be produced by owner before moving.  

bottom of page